
156
2008K Hemodialysis Machine Operator’s Manual Rev P
Chapter 6—Alarms and Troubleshooting
BVM No Communication
The BVM module has lost
communication with the 2008K
system.
Alarm
Press
RESET
to clear the message. BVM will no longer pass
information to the 2008K monitor until power has been turned off and
back on. If alarm is not cleared, return the blood to the patient if
alarm occurs during treatment. Take the machine out of service and
alert a qualified service technician.
Chem not Connected?
The red acid connector is still
connected to the red rinse port
Warning
Connect the red (acid) connector into its correct configuration for the
operation selected.
Concentrate Connected?
The red acid connector is not
connected to the concentrate
container.
Warning
Connect the red (acid) connector to the acid/acetate supply.
Cond Offset Failure
Electronic self-test failure.
Alarm
Turn machine power Off and back On. If alarm is not cleared, take
the machine out of service and alert a qualified service technician.
Cond Ref Failure
Electronic self-test failure.
Alarm
Turn machine power Off and back On. If alarm is not cleared, take
the machine out of service and alert a qualified service technician.
Conductivity High
The actual or measured conductivity
has exceeded the high conductivity
alarm limit. The machine is in bypass
mode.
Dialysate
Alarm
1) Check for the prescribed baseline Na
+
and
Bicarbonate values on
the “Dialysate”
screen and re-enter the correct value for any
erroneous values.
Note
: The SVS must be off before attempting to adjust
any parameter on this screen.
2) Check that the concentrates are properly mixed and in their
proper containers. Remix concentrates as needed.
3) Allow five minutes for conductivity to reach the prescribed level
and adjust the conductivity alarm limit window if necessary (see
“Conductivity Limits” on page 69.
4) Verify that there is flow out of the drain.
5) Replace the concentrates if it appears that the fluid is being
pulled in, but the conductivity is still high. After the prescribed
conductivity is reached, verify the conductivity and the pH using
independent testing devices.
If unable to attain prescribed conductivity, discontinue treatment and
alert a qualified service technician.
Содержание DIASAFE 2008 K
Страница 1: ...2008K Hemodialysis Machine Operator s Manual P N 490042 Rev P ...
Страница 6: ...6 2008K Hemodialysis Machine Operator s Manual Rev P This page intentionally blank ...
Страница 19: ...General Warnings 2008K Hemodialysis Machine Operator s Manual Rev P 19 This page intentionally blank ...