Maintenance
135
It must be solvent-washed and nitrogen-dried. The bulkhead connector at the rear of
the instrument is a 1/8 inch Swagelok fitting.
To prepare mass spectrometer for CI:
NOTE: Make sure to purge the CI line before you attach it to the rear of the mass
spectrometer.
1.
Obtain the CI gas cylinder for your analysis.
2.
Connect the gas line to the CI Gas connector on the rear of the mass
spectrometer.
3.
Ensure that the mass spectrometer is at the proper vacuum level.
4.
Turn on the CI gas and set the delivery pressure to 15 psi (104 kPa).
WARNING
AVERTISSEMENT
If ammonia is used for chemical ionization, all fittings and tubing
must be stainless steel to avoid corrosion. Also, the forepump
must be vented to a fume hood or trap.
Si l'ammoniac est utilisé pour l'ionisation chimique, tous les
raccords et tubes doivent être en acier inoxydable pour éviter
toute corrosion. En outre, le fordump doit être évacué vers une
hotte ou un piège
Summary of Contents for Clarus SQ 8 MS Series
Page 1: ...CLARUS SQ 8 MS Hardware Guide GAS CHROMATOGRAPHY ...
Page 2: ......
Page 3: ...Clarus SQ 8 MS Hardware Guide ...
Page 8: ......
Page 9: ...Warnings and Safety Information 1 ...
Page 10: ......
Page 18: ...Label Location and Content Figure 1 Front View of Clarus SQ 8 T ...
Page 46: ......
Page 47: ...Introduction 2 ...
Page 48: ......
Page 52: ......
Page 53: ...About the Clarus GC MS System 3 ...
Page 54: ......
Page 64: ......
Page 67: ...Maintenance 65 Maintenance 4 ...
Page 68: ......
Page 69: ...Maintenance 67 ...
Page 98: ...Clarus SQ 8 MS Hardware Guide 96 Figure 19 Inserting the Plug Handle and Sight ...
Page 148: ...Troubleshooting 5 ...
Page 149: ...Troubleshooting 147 ...
Page 178: ...TurboMass Software Installation 176 ...
Page 179: ...Index ...
Page 180: ......
Page 183: ......