Clarus SQ 8 MS Hardware Guide
98
12.
Carefully continue inserting the column into the Transfer Line tube until it
becomes visible inside the Plug Handle and Sight. Be careful to avoid inserting
the column so far that it hits the far side of the MS vacuum chamber.
13.
Position the outlet end of the column so it aligns with the edge of the engraved
circle on the tip of the Plug Handle and Sight.
The correct position of the column is reached when it is aligned with the edge
of the circle (in other words, at the "3 o'clock" position).
Figure 21 Viewing the Column through the Plug Handle and Sight.
14.
Using the 5 mm and 1/4 inch crescent wrenches, tighten the column nut until
the ferrule is crimped onto the column. Be careful to avoid moving the column
from the set position. Confirm by gently tugging back the column. It should not
move from the set position. Verify that the column placement is correct by
visually inspecting its position on the circle inside the Plug Handle and Sight.
Circle
Column at 3
o’clock position
Summary of Contents for Clarus SQ 8 MS Series
Page 1: ...CLARUS SQ 8 MS Hardware Guide GAS CHROMATOGRAPHY ...
Page 2: ......
Page 3: ...Clarus SQ 8 MS Hardware Guide ...
Page 8: ......
Page 9: ...Warnings and Safety Information 1 ...
Page 10: ......
Page 18: ...Label Location and Content Figure 1 Front View of Clarus SQ 8 T ...
Page 46: ......
Page 47: ...Introduction 2 ...
Page 48: ......
Page 52: ......
Page 53: ...About the Clarus GC MS System 3 ...
Page 54: ......
Page 64: ......
Page 67: ...Maintenance 65 Maintenance 4 ...
Page 68: ......
Page 69: ...Maintenance 67 ...
Page 98: ...Clarus SQ 8 MS Hardware Guide 96 Figure 19 Inserting the Plug Handle and Sight ...
Page 148: ...Troubleshooting 5 ...
Page 149: ...Troubleshooting 147 ...
Page 178: ...TurboMass Software Installation 176 ...
Page 179: ...Index ...
Page 180: ......
Page 183: ......