Maintenance
99
15.
Loosen the large ¼ inch nut on the Transfer Line tube assembly using the 9/16
inch wrench and pull back the Transfer Line tube approximately 1 to 2 inches.
See Figure 9.
16.
Turn the Plug Handle and Sight counterclockwise to the unlock symbol on the
instrument and remove it from the Clarus SQ 8 MS instrument.
17.
Insert the source. See
Removing and Returning the Source
on page
Error!
Bookmark not defined.
.
18.
Re-insert the Transfer Line tube assembly and tighten the large nut.
19.
The column is now installed and the MS is ready to be pumped down. Confirm
that the proper vacuum level is reached (on the TurboMass software Tune
Page).
20.
After initially heating the GC oven through one or two analysis cycles, the
column nut may loosen. Re-tighten the column nut. After re-tightening, the
column nut should not loosen any more.
Summary of Contents for Clarus SQ 8 MS Series
Page 1: ...CLARUS SQ 8 MS Hardware Guide GAS CHROMATOGRAPHY ...
Page 2: ......
Page 3: ...Clarus SQ 8 MS Hardware Guide ...
Page 8: ......
Page 9: ...Warnings and Safety Information 1 ...
Page 10: ......
Page 18: ...Label Location and Content Figure 1 Front View of Clarus SQ 8 T ...
Page 46: ......
Page 47: ...Introduction 2 ...
Page 48: ......
Page 52: ......
Page 53: ...About the Clarus GC MS System 3 ...
Page 54: ......
Page 64: ......
Page 67: ...Maintenance 65 Maintenance 4 ...
Page 68: ......
Page 69: ...Maintenance 67 ...
Page 98: ...Clarus SQ 8 MS Hardware Guide 96 Figure 19 Inserting the Plug Handle and Sight ...
Page 148: ...Troubleshooting 5 ...
Page 149: ...Troubleshooting 147 ...
Page 178: ...TurboMass Software Installation 176 ...
Page 179: ...Index ...
Page 180: ......
Page 183: ......