Pre-Operational Checklist
This checklist provides you with a list of items to check to make sure everything is
in working order before you begin to use Clarus.
Item
OK
Are the gases connected to the GC?
Is the proper column connected?
Is the proper liner installed in the injector?
Are your samples prepared?
Is there a GC method?
Is the GC split vent open?
Is the proper mass spectrometer vacuum achieved?
Is the system leak-free?
Is there a mass spectrometer method?
Are the autosampler wash vials filled with solvent?
Are you using the proper column flow or pressure?
Did you check the air/water spectrum on the TurboMass Tune screen?
Is the injector hot and set to the proper temperature?
Is the transfer line hot and set to the proper temperature?
Is the source hot and set to the proper temperature?
Summary of Contents for Clarus SQ 8 MS Series
Page 1: ...CLARUS SQ 8 MS Hardware Guide GAS CHROMATOGRAPHY ...
Page 2: ......
Page 3: ...Clarus SQ 8 MS Hardware Guide ...
Page 8: ......
Page 9: ...Warnings and Safety Information 1 ...
Page 10: ......
Page 18: ...Label Location and Content Figure 1 Front View of Clarus SQ 8 T ...
Page 46: ......
Page 47: ...Introduction 2 ...
Page 48: ......
Page 52: ......
Page 53: ...About the Clarus GC MS System 3 ...
Page 54: ......
Page 64: ......
Page 67: ...Maintenance 65 Maintenance 4 ...
Page 68: ......
Page 69: ...Maintenance 67 ...
Page 98: ...Clarus SQ 8 MS Hardware Guide 96 Figure 19 Inserting the Plug Handle and Sight ...
Page 148: ...Troubleshooting 5 ...
Page 149: ...Troubleshooting 147 ...
Page 178: ...TurboMass Software Installation 176 ...
Page 179: ...Index ...
Page 180: ......
Page 183: ......