Performance Verification
18-7
3.
Select GLOBAL, and then press ENTER. The unit then displays:
GLOBAL SETUP MENU
SAVE RESTORE POWERON RESET
4.
Select RESET, and then press ENTER. The unit displays:
RESET ORIGINAL DFLTS
BENCH GPIB
5.
Select BENCH, and then press ENTER to restore BENCH defaults.
Test summary
•
DC voltage output accuracy
•
DC voltage measurement accuracy
•
DC current output accuracy
•
DC current measurement accuracy
•
Resistance measurement accuracy
If the Model 6430 is not within speci
fi
cations and not under warranty, see the calibration
procedures in Section 19 for information on calibrating the unit.
Test considerations
When performing the veri
fi
cation procedures:
•
Restore factory front panel defaults as previously outlined.
•
Make sure that the test equipment is properly warmed up and connected to the Model
6430 jacks.
•
Set the Model 6430 to the correct source range. See below.
•
Be sure that the Model 6430 output is turned on before making measurements.
•
Be sure the test equipment is set up for the proper function and range.
•
Allow the Model 6430 output signal to settle before making a measurement.
•
Do not connect test equipment to the Model 6430 through a scanner, multiplexer, or
other switching equipment.
WARNING
The maximum common-mode voltage (voltage between mainframe LO
and chassis ground or PreAmp IN/OUT LOW and chassis ground) is ±42V
DC. Exceeding this value may create a shock hazard.
CAUTION
Exceeding the following voltage values between these terminals may result
in instrument damage:
•
INPUT/OUTPUT HI and LO: 250V peak.
•
4-WIRE SENSE HI and LO: 250V peak.
•
INPUT/OUTPUT HI and 4-WIRE SENSE HI: 5V.
•
INPUT/OUTPUT LO and 4-WIRE SENSE LO: 5V.
•
Preamp IN/OUT HI or SENSE HI and GUARD: 40V peak.
•
Preamp GUARD and IN/OUT LOW: 250V peak.
Summary of Contents for 6430
Page 26: ......
Page 32: ......
Page 78: ...2 14 Connections ...
Page 98: ...3 20 Basic Source Measure Operation ...
Page 138: ...5 30 Source Measure Concepts ...
Page 156: ...6 18 Range Digits Speed and Filters ...
Page 168: ...7 12 Relative and Math ...
Page 176: ...8 8 Data Store ...
Page 202: ...9 26 Sweep Operation ...
Page 248: ...11 22 Limit Testing ...
Page 310: ...16 6 SCPI Signal Oriented Measurement Commands ...
Page 418: ...17 108 SCPI Command Reference ...
Page 450: ...18 32 Performance Verification ...
Page 477: ...A Specifications ...
Page 489: ...B StatusandErrorMessages ...
Page 498: ...B 10 Status and Error Messages ...
Page 499: ...C DataFlow ...
Page 503: ...D IEEE 488BusOverview ...
Page 518: ...D 16 IEEE 488 Bus Overview ...
Page 519: ...E IEEE 488andSCPI ConformanceInformation ...
Page 523: ...F MeasurementConsiderations ...
Page 539: ...G GPIB488 1Protocol ...
Page 557: ......