![background image](http://html.mh-extra.com/html/keithley/6430/6430_instruction-manual_661765440.webp)
18-22
Performance Verification
1pA-100nA range accuracy
1.
With the power off, connect the digital multimeter and calibration standard to the
Model 6430 mainframe and Remote PreAmp as shown in Figure 18-7. (Connect the
mainframe INPUT/OUTPUT HI and LO jacks to DMM INPUT HI and LO respec-
tively. Connect the PreAmp IN/OUT HIGH jack directly to the Model 5156 OUTPUT
jack, and connect the BNC shorting cap to the 100G
Ω
resistance jack.
Also be sure to
remove the link between the Model 5156 SHIELD and CHASSIS jacks.
)
WARNING:
NO INTERNAL OPERATOR SERVICABLE PARTS,SERVICE BY QUALIFIED PERSONNEL ONLY.
WARNING:
NO INTERNAL OPERATOR SERVICABLE PARTS,SERVICE BY QUALIFIED PERSONNEL ONLY.
CAUTION:
FOR CONTINUED PROTECTION AGAINST FIRE HAZARD,REPLACE FUSE WITH SAME TYPE AND RATING.
CAUTION:
FOR CONTINUED PROTECTION AGAINST FIRE HAZARD,REPLACE FUSE WITH SAME TYPE AND RATING.
MADE IN
U.S.A.
INPUT/
OUTPUT
42V
PEAK
250V
PEAK
TRIGGER
LINK
4-WIRE
SENSE
HI
LO
LINE RATING
100-240VAC
50, 60, HZ
100VA MAX
RS232
IEEE-488
(ENTER IEEE ADDRESS
WITH FRONT PANEL MENU)
250V
PEAK
5V
PEAK
5V
PEAK
5V
PK
V,
Ω
,
GUARD
GUARD
SENSE
LINE FUSE
SLOWBLOW
2.5A, 250V
INTERLOCK-
DIGITAL I/O
REMOTE
PreAmp
!
Connect PreAmp IN/OUT HIGH Jack
Directly to 5156 OUTPUT Jack
using triax male-to-male Adapter
BNC Shorting Plug
(Connect to Resistor
Being used)
Note
: Remove Link Between
SHIELD and CHASSIS
Mainframe/PreAmp Cable
Model 6430
Input HI
Input LO
Digital Multimeter
100G
Ω
1 nF
100nF
10G
Ω
1G
Ω
100M
Ω
Model 5156 Electrometer Calibration Standard
Figure 18-7
Connections for
1pA-100nA
range current
verification tests
Summary of Contents for 6430
Page 26: ......
Page 32: ......
Page 78: ...2 14 Connections ...
Page 98: ...3 20 Basic Source Measure Operation ...
Page 138: ...5 30 Source Measure Concepts ...
Page 156: ...6 18 Range Digits Speed and Filters ...
Page 168: ...7 12 Relative and Math ...
Page 176: ...8 8 Data Store ...
Page 202: ...9 26 Sweep Operation ...
Page 248: ...11 22 Limit Testing ...
Page 310: ...16 6 SCPI Signal Oriented Measurement Commands ...
Page 418: ...17 108 SCPI Command Reference ...
Page 450: ...18 32 Performance Verification ...
Page 477: ...A Specifications ...
Page 489: ...B StatusandErrorMessages ...
Page 498: ...B 10 Status and Error Messages ...
Page 499: ...C DataFlow ...
Page 503: ...D IEEE 488BusOverview ...
Page 518: ...D 16 IEEE 488 Bus Overview ...
Page 519: ...E IEEE 488andSCPI ConformanceInformation ...
Page 523: ...F MeasurementConsiderations ...
Page 539: ...G GPIB488 1Protocol ...
Page 557: ......