18-2
Performance Verification
Introduction
Use the procedures in this section to verify that Model 6430 accuracy is within the limits
stated in the instrument
’
s one-year accuracy speci
fi
cations. You can perform these veri
fi
cation
procedures:
•
When you
fi
rst receive the instrument to make sure that it was not damaged during
shipment.
•
To verify that the unit meets factory speci
fi
cations.
•
To determine if calibration is required.
•
Following calibration to make sure it was performed properly.
WARNING
The information in this section is intended for qualified service personnel
only. Do not attempt these procedures unless you are qualified to do so.
Some of these procedures may expose you to hazardous voltages, which
could cause personal injury or death if contacted. Use standard safety pre-
cautions when working with hazardous voltages.
The Remote PreAmp connectors carry hazardous voltage. To prevent risk
of electric shock, connectors must be fully mated or safety covers must be
placed over the open connectors. Proper installation requires that the oper-
ator is protected from exposed voltages by insulation or barriers.
NOTE
If the instrument is still under warranty and its performance is outside specified lim-
its, contact your Keithley representative or the factory to determine the correct
course of action.
Veri
fi
cation test requirements
Be sure that you perform the veri
fi
cation tests:
•
Under the proper environmental conditions.
•
After the speci
fi
ed warm-up period.
•
Using the correct line voltage.
•
Using the proper test equipment.
•
Using the speci
fi
ed output signals and reading limits.
Environmental conditions
Conduct your performance veri
fi
cation procedures in a test environment with:
•
An ambient temperature of 18-28
°
C (65-82
°
F).
•
A relative humidity of less than 60% unless otherwise noted.
Summary of Contents for 6430
Page 26: ......
Page 32: ......
Page 78: ...2 14 Connections ...
Page 98: ...3 20 Basic Source Measure Operation ...
Page 138: ...5 30 Source Measure Concepts ...
Page 156: ...6 18 Range Digits Speed and Filters ...
Page 168: ...7 12 Relative and Math ...
Page 176: ...8 8 Data Store ...
Page 202: ...9 26 Sweep Operation ...
Page 248: ...11 22 Limit Testing ...
Page 310: ...16 6 SCPI Signal Oriented Measurement Commands ...
Page 418: ...17 108 SCPI Command Reference ...
Page 450: ...18 32 Performance Verification ...
Page 477: ...A Specifications ...
Page 489: ...B StatusandErrorMessages ...
Page 498: ...B 10 Status and Error Messages ...
Page 499: ...C DataFlow ...
Page 503: ...D IEEE 488BusOverview ...
Page 518: ...D 16 IEEE 488 Bus Overview ...
Page 519: ...E IEEE 488andSCPI ConformanceInformation ...
Page 523: ...F MeasurementConsiderations ...
Page 539: ...G GPIB488 1Protocol ...
Page 557: ......