July 2004
Installation /
Putting into Operation
2 - 21
1: place a measuring cylinder of approx.
180 ml (6 oz) under the outlet.
2: press an outlet button below
CALIBRATE hot outlet valves
!!! Caution: hot water !!!
WATER
GO TO COLD
CALIBRATION: dispensing test dosing
Calibration in progress
Dispense test dosing..... please wait
!!! Caution: hot water !!!
CALIBRATE: Hot outlet valve: WATER
1: place the empty measuring cylinder
again under the WATER outlet
2: press the START button below
100 ml
Please enter the volume of water in your
measuring cylinder:
CALIBRATE: Hot outlet valve: WATER
!!! Caution: hot water !!!
CALIBRATION: dispensing test dosing
Calibration in progress
Dispense test dosing..... please wait
!!! Caution: hot water !!!
CALIBRATE: Hot outlet valve: WATER
Was the volume of the verification
dosing equal to 100 ml +/- 2 ml
NO
YES
Your entered volume is outside the limits
(+/- 20%).
Please check the valve for damage, lime
scale, or leakage. Also check the boiler
water level.
CALIBRATE: Hot outlet valve: WATER
Please repeat the calibration procedure
CALIBRATE: Hot outlet valve: WATER
The WATER valve was calibrated
successfully, which will be indicated by
a ‚
‘ sign.
1: place a measuring cylinder of approx.
180 ml (6 oz) under the outlet.
2: press an outlet button below
CALIBRATE hot outlet valves
!!! Caution: hot water !!!
STEP 1:
In the main service menu
select the submenu
'CALIBRATE'.
STEP 2:
Select 'WATER'.
STEP 3:
During the 1st–3rd pass
enter 80 ml for
'DECREASE'.
STEP 6:
From the 4th pass on, enter
the measured volume for
'DECREASE' or
'INCREASE' when it is
more than 80 ml.
Otherwise, enter 80 ml
once more and repeat the
process.
STEP 4
:
Select 'NO'.
STEP 5
:
Repeat
STEP 2–STEP 4
3 times.
STEP 7
:
Select 'YES', when the
measured water volume is
100 ml +/- 2 ml.
Select 'NO' and repeat the
calibration when the meas-
ured water volume is out of
the tolerances.
LEFT
MIDDLE
RIGHT
DECREASE
INCREASE
ENTER
CHANGE
START VERIFICATION DOSING
CONTINUE
GO TO COLD
WATER
LEFT
MIDDLE
RIGHT
CONTINUE
CONTINUE
Cafitesse 700 - Installation / Puttting into Operation
Summary of Contents for Cafitesse 700
Page 4: ......
Page 6: ...July 2004 1 2 Cafitesse 700 Preface and safety instructions ...
Page 12: ...July 2004 1 8 Cafitesse 700 Preface and safety instructions ...
Page 39: ...July 2004 3 1 Table of contents Errors 3 ...
Page 99: ...July 2004 4 36 Cafitesse 700 Programming ...
Page 174: ...July 2004 5A 32 Functions water system Cafitesse 700 Functions water system ...
Page 176: ...July 2004 5B 2 Functions Brewing System Cafitesse 700 Functions Brewing system ...
Page 204: ...July 2004 5F 2 Functions cooling system Cafitesse 700 Functions cooling system ...
Page 232: ...July 2004 5G 8 Functions housing Cafitesse 700 Functions housing ...
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 259: ...July 2004 5L 2 Functions external options Cafitesse 700 Functions external options ...
Page 263: ...July 2004 5P 4 Functions payment systems Cafitesse 700 Functions payment systems ...