July 2004
Installation /
Putting into Operation
2 - 25
Electrical connection:
Only by power cable and plug, otherwise a contact breaking
device for all poles must be installed.
The dispenser is marked with the CE label.
(Directive about electrical equipment of low voltage, directive
about electromagnetic compatibility, machinery directive)
WARNING:
The connection must be grounded!
We recommend the installation of a fault
current safety switch.
European version:
Relay internally connected for 1-phase or 3-phase operation.
The dispenser is equipped with 3 relays.
The power supply cable has got 5 cores and a grounding
contact plug.
USA version:
The dispenser is equipped with 3 relays.
power supply cable 3x10AWG/30 A Kod
Power supply cable length:
approx. 1.80 m/70.9 in
Boiler:
Open system, electronic control of the water temperature,
dry running protection (electronic monitoring by means of
sensors),
electronic low temperature indicator, electronic boil over sensor
Beverage delivery capacity:
100 cups at 100cc (3.3 floz USA) per hour and kW heating capacity
Cooling system:
Thermoelectric cooling: Peltier element, axial blower,
electronically controlled ON/OFF
Power consumption:
- max. 188 W in standby mode
Cafitesse 700 - Installation / Puttting into Operation
Summary of Contents for Cafitesse 700
Page 4: ......
Page 6: ...July 2004 1 2 Cafitesse 700 Preface and safety instructions ...
Page 12: ...July 2004 1 8 Cafitesse 700 Preface and safety instructions ...
Page 39: ...July 2004 3 1 Table of contents Errors 3 ...
Page 99: ...July 2004 4 36 Cafitesse 700 Programming ...
Page 174: ...July 2004 5A 32 Functions water system Cafitesse 700 Functions water system ...
Page 176: ...July 2004 5B 2 Functions Brewing System Cafitesse 700 Functions Brewing system ...
Page 204: ...July 2004 5F 2 Functions cooling system Cafitesse 700 Functions cooling system ...
Page 232: ...July 2004 5G 8 Functions housing Cafitesse 700 Functions housing ...
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 259: ...July 2004 5L 2 Functions external options Cafitesse 700 Functions external options ...
Page 263: ...July 2004 5P 4 Functions payment systems Cafitesse 700 Functions payment systems ...