July 2004
Installation /
Putting into Operation
2 - 5
Customer
Recommendation:
Water supply line with stop valve and non-
return valve.
Connection to hot water line only with suitable
supply lines.
Supply system
Temperature:
max. 75
°
C (167
°
F)
Dynamic pressure:
min. 0.8 bar at 10l/min
(11.6 psi at 2.6 US gal/
min).
Static pressure:
max. 10 bar (145 psi)
Dispenser
Connections for hoses: 3/4"–5/8-18UNF
National connecting pieces are included in the
corresponding country kits.
USA version: The dispenser must be installed
with an adequate return flow stop, which
complies with the local regulations.
2.2.2 Water supply
ATTENTION:
Check the drinking water
quality before installation,
especially when installing a
tank for manual filling.
A drinking water filter should
always be installed.
ATTENTION:
When using new water pipes,
flush them sufficiently before
installation.
Read local regulations care-
fully when choosing supply
lines. Only use neutral material
with respect to taste.
Cafitesse 700 - Installation / Puttting into Operation
Summary of Contents for Cafitesse 700
Page 4: ......
Page 6: ...July 2004 1 2 Cafitesse 700 Preface and safety instructions ...
Page 12: ...July 2004 1 8 Cafitesse 700 Preface and safety instructions ...
Page 39: ...July 2004 3 1 Table of contents Errors 3 ...
Page 99: ...July 2004 4 36 Cafitesse 700 Programming ...
Page 174: ...July 2004 5A 32 Functions water system Cafitesse 700 Functions water system ...
Page 176: ...July 2004 5B 2 Functions Brewing System Cafitesse 700 Functions Brewing system ...
Page 204: ...July 2004 5F 2 Functions cooling system Cafitesse 700 Functions cooling system ...
Page 232: ...July 2004 5G 8 Functions housing Cafitesse 700 Functions housing ...
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 259: ...July 2004 5L 2 Functions external options Cafitesse 700 Functions external options ...
Page 263: ...July 2004 5P 4 Functions payment systems Cafitesse 700 Functions payment systems ...