July 2004
Installation /
Putting into Operation
2 - 4
2.2 Installation requirements
2.2.1 Tools
•
The following tools are required for installation.
Tools:
required for:
1. RFID tag
Programming
- Operator tag (red)
customer-specific
- Service tag (blue)
settings
2. Pressure gauge
Measuring the
water pressure
Part number
see spare parts list
3. Several
e. g.
screw drivers
for installing
part numbers
customer-specific
see spare parts list
kits
4. Rotary switch
Adjusting the
heating capacity
Part number
see spare parts list
5. Adapter cable
For the connection to European mains sockets that are different from the
German/French safety plug socket, adapter cables are available (see
table). (See also chapter 5.K.7 – Accessories)
Part number
see spare parts list
Cafitesse 700 - Installation / Puttting into Operation
Summary of Contents for Cafitesse 700
Page 4: ......
Page 6: ...July 2004 1 2 Cafitesse 700 Preface and safety instructions ...
Page 12: ...July 2004 1 8 Cafitesse 700 Preface and safety instructions ...
Page 39: ...July 2004 3 1 Table of contents Errors 3 ...
Page 99: ...July 2004 4 36 Cafitesse 700 Programming ...
Page 174: ...July 2004 5A 32 Functions water system Cafitesse 700 Functions water system ...
Page 176: ...July 2004 5B 2 Functions Brewing System Cafitesse 700 Functions Brewing system ...
Page 204: ...July 2004 5F 2 Functions cooling system Cafitesse 700 Functions cooling system ...
Page 232: ...July 2004 5G 8 Functions housing Cafitesse 700 Functions housing ...
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 259: ...July 2004 5L 2 Functions external options Cafitesse 700 Functions external options ...
Page 263: ...July 2004 5P 4 Functions payment systems Cafitesse 700 Functions payment systems ...