July 2004
Installation /
Putting into Operation
2 - 3
Transport due to location change
When transporting single dispensers,
place them on the special Cafitesse
pallet (0.78 m x 0.55 m).
When transporting a used dispenser to a new
location:
•
Disconnect the mains plug.
•
Disconnect the dispenser from the water
supply.
•
Remove the product packs (BIBs).
•
Drain the boiler.
WARNING:
Danger of being scalded by
hot water!
•
Tilt the boiler forwards in order to drain the
residual water.
•
Pack the dispenser in such a manner that a
safe transport is guaranteed. Use the original
packaging if possible. (Fig. 1, 2)
•
Before storing the dispenser for a longer
period of time, it must have been cleaned
correctly.
•
When used dispensers are stored for a long
time, the inlet valve of the water supply hose
towards the boiler must be disconnected in
order to ensure that the hose is empty. In
this way, future spoiling of the taste is
avoided.
Original packaging by the manufacturer
•
European pallets (0.80 m x 1.20 m/
31.49 in x 47.24 in):
2 Cafitesse 700 dispensers (1 pile with
2 dispensers)
•
U.S. pallets (1.00 m x 1.20 m/39.37 in x
47.24 in):
2 Cafitesse 700 dispensers (1 pile with
2 dispensers)
Storage requirements
•
The dispenser must be stored in dry and
frostproof ambient conditions, and must not
be exposed to sunlight.
xxxxx
xxxx
xxxx
xxx
xxxxx
x xx
xxxxx
xxx
xxxx
xxxx
x xx
xxxx
x
xxxx
xx x
xxxx
xxxx
x
xxxx
xxxx
x xx
xxxx
x
xxxx
xx x
xxxx
xxxx
x
xxxx
xxxx
x xx
xxxx
x
xxxx
xx x
xxxx
xxxx
x
Fig. 1
Fig. 2
Cafitesse 700 - Installation / Puttting into Operation
Cafitesse 700 - Installation / Puttting into Operation
Summary of Contents for Cafitesse 700
Page 4: ......
Page 6: ...July 2004 1 2 Cafitesse 700 Preface and safety instructions ...
Page 12: ...July 2004 1 8 Cafitesse 700 Preface and safety instructions ...
Page 39: ...July 2004 3 1 Table of contents Errors 3 ...
Page 99: ...July 2004 4 36 Cafitesse 700 Programming ...
Page 174: ...July 2004 5A 32 Functions water system Cafitesse 700 Functions water system ...
Page 176: ...July 2004 5B 2 Functions Brewing System Cafitesse 700 Functions Brewing system ...
Page 204: ...July 2004 5F 2 Functions cooling system Cafitesse 700 Functions cooling system ...
Page 232: ...July 2004 5G 8 Functions housing Cafitesse 700 Functions housing ...
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 259: ...July 2004 5L 2 Functions external options Cafitesse 700 Functions external options ...
Page 263: ...July 2004 5P 4 Functions payment systems Cafitesse 700 Functions payment systems ...