B337EN4_8
Operation
4-195
7.
Working with the summary production
plan
1
The summary production plan permits the execution of several
sheet programs one after the other without requiring that these be
started individually at the control panel. The summary production
plan needs to be applied at the system: it is used exclusively with
machines that have pallet changers.
Sheet jobs can only be generated from NC programs which are
available in the NCU in split form. Exactly one NC program is
allocated to each sheet job. The following are determined in the
sheet job:
The respective pallet travels into the working area of the machine
and machining starts only after the ACKNOWLEDGE LOADING
button has been pressed at the start post.
Machine example:
Start post
Code
Pallets
1
1000
PCX1
2
0100
Individual PCY1
3
0010
Individual PWY2
4
0001
PWX2
2 or 3
0110
Coupled PCY1 and PCY2
The counting process for the code of the start posts begins at the
pallet positioned furthest to the left. The start post for this pallet is
therefore assigned the code "1". This is the start post for the PCX1
pallet changer in the machine example.
1
Valid for machines with a pallet changer.
•
The order (sequence) in which the programs are to be
executed.
•
The number of workpieces (required) to be processed by each
program.
•
The table (location) on which a program is be processed.
Loading location (location)
The pallet on which an NC program is to be executed is determined
by the operator in the "Location" parameter of the sheet job. Each
pallet is allocated at least one start post. A 2-bit code (0 or 1) is
stored in the control system for each start post. This code
corresponds to the code which the operator has to enter in the
"Location" parameter.
Loading location code
The code for the loading location depends on the version of the
linear changer applied to the machine. Four linear changers with
one start post each have been applied in the following machine
example. In this case, the code has 4 digits.
Содержание LASERCELL 1005
Страница 1: ...Operator s manual TRUMPF LASERCELL 1005...
Страница 2: ......
Страница 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Страница 6: ...0 6 Before You proceed B337EN00 DOC...
Страница 22: ...0 22 Table of Contents B337EN00 DOC...
Страница 23: ...1...
Страница 61: ...1 38 Laser processing B337EN01 DOC...
Страница 62: ...2...
Страница 107: ...3...
Страница 160: ...4...
Страница 238: ...4 78 Operation B337EN4_3 Fig 39422 Fig 39423en Cutting a large contour Cutting a medium contour...
Страница 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Страница 409: ...B337EN4_8 Operation 4 249 Fig 36626 Fig 36627 Backup starts 6 Enter file name press Enter 7 Press Y...
Страница 412: ...4 252 Operation B337EN4_8...
Страница 413: ...5...
Страница 515: ...5 102 Further service programs B337EN05 DOC...
Страница 516: ...6...
Страница 546: ...6 30 Machine maintenance B337EN06 doc 5 Maintenance of pneumatic components and filters 5 1 Instrument panel Fig 39484...
Страница 589: ...7...
Страница 628: ...8...
Страница 635: ...B337EN08 DOC Cross hairs to cut out 8 7 5 Cross hairs to cut out Cross hairs to cut out Fig 6310...
Страница 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Страница 637: ...9...
Страница 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Страница 644: ...10...