7-36
Maintenance of laser
B337EN07.doc
Maintenance point
Interval /
Operating
hours
Maintenance information
Fig. 23460
Fig. 23462
•
Insert the generator tube carefully into the generator tube
socket.
•
Press on the generator tube from above until it locks into its
mount.
•
Fix the generator tube to the mounting plate using the fixing
screws.
•
On the top of the tube, remove the protective plugs for the
water connections.
•
Place the sacrificial anodes with sealing ring onto the water
connections.
•
Teflon hoses may not cross each other.
•
They must have a minimum clearance of 40 mm to neigh-
bouring components and the sheet metal panelling.
•
The cooling water flow is against the direction of the arrow.
•
Teflon hoses onto the sacrificial anodes and into the clamps
designed to secure the hoses.
•
First finger-tighten the union nuts.
Then use two revolutions of a spanner to tighten.
Check the screw joint for consistency.
Check the system
for consistency
After the cooling water connections of the generator tube have
been made, check whether the cooling system leaks.
•
Isolate the generator.
•
Secure the grounding hooks in the output stage.
•
Recheck all the water connections for good fit before switching
on the cooling water supply.
•
Switch on the cooling water supply.
•
Upon activation, check the consistency of all connections and
water screw joints, particularly the connections of the output
stage pipe.
•
Switch the cooling water supply back off.
•
Close the RF output stage with the cover plate.
Содержание LASERCELL 1005
Страница 1: ...Operator s manual TRUMPF LASERCELL 1005...
Страница 2: ......
Страница 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Страница 6: ...0 6 Before You proceed B337EN00 DOC...
Страница 22: ...0 22 Table of Contents B337EN00 DOC...
Страница 23: ...1...
Страница 61: ...1 38 Laser processing B337EN01 DOC...
Страница 62: ...2...
Страница 107: ...3...
Страница 160: ...4...
Страница 238: ...4 78 Operation B337EN4_3 Fig 39422 Fig 39423en Cutting a large contour Cutting a medium contour...
Страница 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Страница 409: ...B337EN4_8 Operation 4 249 Fig 36626 Fig 36627 Backup starts 6 Enter file name press Enter 7 Press Y...
Страница 412: ...4 252 Operation B337EN4_8...
Страница 413: ...5...
Страница 515: ...5 102 Further service programs B337EN05 DOC...
Страница 516: ...6...
Страница 546: ...6 30 Machine maintenance B337EN06 doc 5 Maintenance of pneumatic components and filters 5 1 Instrument panel Fig 39484...
Страница 589: ...7...
Страница 628: ...8...
Страница 635: ...B337EN08 DOC Cross hairs to cut out 8 7 5 Cross hairs to cut out Cross hairs to cut out Fig 6310...
Страница 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Страница 637: ...9...
Страница 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Страница 644: ...10...