2-22
Installation conditions TLC 1000 and TLC 1005 - Version 5
B337EN02.DOC
2.3 Welding gases (inert gases)
Purity
Welding gas
Purity
Helium (He)
4.6
99.996 % vol.
Argon (Ar)
4.6
99.996 % vol.
Nitrogen (N
2
)
2.8
99.8 % vol.
Carbon dioxide (CO
2
)
2.5
99.5 % vol.
Welding gas – purity
Supply lines
Note
The customer must provide the supply lines for the protective
gases up to the connection point on the machine.
Flowrate [l/min] 40
Flow pressure
[bar] 5
Cable
NW 8
Push-in fitting
[mm]
∅
8
Welding gas supply – machine connection
Table 2-15
Connection point
on machine entrance
Table 2-16
Содержание LASERCELL 1005
Страница 1: ...Operator s manual TRUMPF LASERCELL 1005...
Страница 2: ......
Страница 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Страница 6: ...0 6 Before You proceed B337EN00 DOC...
Страница 22: ...0 22 Table of Contents B337EN00 DOC...
Страница 23: ...1...
Страница 61: ...1 38 Laser processing B337EN01 DOC...
Страница 62: ...2...
Страница 107: ...3...
Страница 160: ...4...
Страница 238: ...4 78 Operation B337EN4_3 Fig 39422 Fig 39423en Cutting a large contour Cutting a medium contour...
Страница 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Страница 409: ...B337EN4_8 Operation 4 249 Fig 36626 Fig 36627 Backup starts 6 Enter file name press Enter 7 Press Y...
Страница 412: ...4 252 Operation B337EN4_8...
Страница 413: ...5...
Страница 515: ...5 102 Further service programs B337EN05 DOC...
Страница 516: ...6...
Страница 546: ...6 30 Machine maintenance B337EN06 doc 5 Maintenance of pneumatic components and filters 5 1 Instrument panel Fig 39484...
Страница 589: ...7...
Страница 628: ...8...
Страница 635: ...B337EN08 DOC Cross hairs to cut out 8 7 5 Cross hairs to cut out Cross hairs to cut out Fig 6310...
Страница 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Страница 637: ...9...
Страница 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Страница 644: ...10...