2-18
Installation conditions TLC 1000 and TLC 1005 - Version 5
B337EN02.DOC
Supply lines to cutting gas supply
The customer must provide the supply lines for the cutting gases
up to the connection point on the machine.
•
The supply lines must be installed up to the connection point
on the installation plan marked with the symbol shown on the
left.
•
The height of the connection position above the floor is approx.
600 mm. The supply line is to be connected from below.
•
Pipes are to be used for the entire gas installation from the gas
cylinder or central gas tank to the machine.
•
The vaporizer must be laid according to the max. consumption
of all connected machines. Moreover, the line connecting the
vaporizer to the connection point on the machine should be as
short as possible.
•
The external gas installation must be arranged in such a way
that the supply lines to the connection point on the machine
and the connection point itself cannot ice up.
•
Stopcocks must be built in to every supply line to the individual
machines. In this way, the supply lines, for example, can be
blocked off and bled during servicing using the purge valve on
the connection point of the machine.
Note
The gas temperature must not exceed 50 °C. This is of particular
importance when the required gas pressure is generated using a
pressure increasing device!
•
Oil and grease-free lines made of copper piping in special
quality ("refrigerator quality", inert-soldered with simple forming
gas) are sufficient for the cutting gases.
•
Stainless steel pipes are not required.
•
To avoid impurities during transport and storage, the pipe ends
must be securely sealed.
Tube
dimensions
Nominal
width [mm]
Applications:
½"
15 x 1
13
From the take-off point to the machine; reduce
to connection diameter before reaching
instrument panel:
for N
2
: 10 x 1, for O
2
: 8 x 1
3/8"
12 x 1
10
up to 10 bar; preferably O
2
5/8"
18 x 1
16
Up to 10 bar; preferably N
2
high-pressure
¾"
22 x 1.5
19
For ring circuits supplying up to two laser units
and for lines from vaporizer to ring circuit
1"
28 x 1.5
25
For ring circuits supplying more than two laser
units and for lines from vaporizer to ring circuit
Cutting gas supply – supply line
Cutting gas connection point
Tubes
Table 2-9
Содержание LASERCELL 1005
Страница 1: ...Operator s manual TRUMPF LASERCELL 1005...
Страница 2: ......
Страница 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Страница 6: ...0 6 Before You proceed B337EN00 DOC...
Страница 22: ...0 22 Table of Contents B337EN00 DOC...
Страница 23: ...1...
Страница 61: ...1 38 Laser processing B337EN01 DOC...
Страница 62: ...2...
Страница 107: ...3...
Страница 160: ...4...
Страница 238: ...4 78 Operation B337EN4_3 Fig 39422 Fig 39423en Cutting a large contour Cutting a medium contour...
Страница 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Страница 409: ...B337EN4_8 Operation 4 249 Fig 36626 Fig 36627 Backup starts 6 Enter file name press Enter 7 Press Y...
Страница 412: ...4 252 Operation B337EN4_8...
Страница 413: ...5...
Страница 515: ...5 102 Further service programs B337EN05 DOC...
Страница 516: ...6...
Страница 546: ...6 30 Machine maintenance B337EN06 doc 5 Maintenance of pneumatic components and filters 5 1 Instrument panel Fig 39484...
Страница 589: ...7...
Страница 628: ...8...
Страница 635: ...B337EN08 DOC Cross hairs to cut out 8 7 5 Cross hairs to cut out Cross hairs to cut out Fig 6310...
Страница 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Страница 637: ...9...
Страница 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Страница 644: ...10...