B337EN02.DOC
Installation conditions TLC 1000 and TLC 1005 - Version 5
2-43
7. Planning
aid
This planning aid is intended to provide you with an overview of the
preparations to be undertaken by the customer.
You will find detailed information in the relevant subchapters of the
installation conditions.
Time before
delivery of the machine
Planning criterion
Action
15 weeks
Personnel and training
Appoint a staff member to be
responsible for the machine
commissioning preparations.
Appoint the operating and
maintenance staff as well as
programmers and arrange a
training schedule for your
specialists.
Appoint a laser safety officer, in
accordance with EN
60825-1
(VBG 93).
14 weeks,
but no later than calendar week ...
Conditions at the installation
site
20
Determine the machine’s final
position. Take into consideration
space requirements using
installation plan.
Check the floor requirements
(floor quality, evenness, oil-proof
floor without expansion joints).
Take the weight and dimensions
of the machine into account.
Check that the requirements for
ambient conditions are met
(ambient temperature, insulation,
purity of ambient air).
Check the transport route
(gateway dimensions, overhead
clearance, cable rack heights,
room to negotiate around
corners, etc.).
12 weeks,
but no later than calendar week ...
Electrical power supply
Install the electrical connections
at the installation site. The
conductor cross section and
fuse protection should be set
out in accordance with the
applicable legal requirements.
30
31
Содержание LASERCELL 1005
Страница 1: ...Operator s manual TRUMPF LASERCELL 1005...
Страница 2: ......
Страница 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Страница 6: ...0 6 Before You proceed B337EN00 DOC...
Страница 22: ...0 22 Table of Contents B337EN00 DOC...
Страница 23: ...1...
Страница 61: ...1 38 Laser processing B337EN01 DOC...
Страница 62: ...2...
Страница 107: ...3...
Страница 160: ...4...
Страница 238: ...4 78 Operation B337EN4_3 Fig 39422 Fig 39423en Cutting a large contour Cutting a medium contour...
Страница 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Страница 409: ...B337EN4_8 Operation 4 249 Fig 36626 Fig 36627 Backup starts 6 Enter file name press Enter 7 Press Y...
Страница 412: ...4 252 Operation B337EN4_8...
Страница 413: ...5...
Страница 515: ...5 102 Further service programs B337EN05 DOC...
Страница 516: ...6...
Страница 546: ...6 30 Machine maintenance B337EN06 doc 5 Maintenance of pneumatic components and filters 5 1 Instrument panel Fig 39484...
Страница 589: ...7...
Страница 628: ...8...
Страница 635: ...B337EN08 DOC Cross hairs to cut out 8 7 5 Cross hairs to cut out Cross hairs to cut out Fig 6310...
Страница 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Страница 637: ...9...
Страница 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Страница 644: ...10...