Installation
3-5
3.3.
Unpacking
There are 2 packages for Brivo OEC 715/785/865 Mobile C-Arm X-ray Product. One is for C-
Arm (L
×
W
×
H=2000mm
×
900mm
×
1995mm. And the other is Workstation (L
×
W
×
H=1015mm
×
900mm
×
2150mm).
Before unpacking, inspect the shipping enclosure /boxes for damage and report to the
shipper if available.
The unpacking of the system should be done before moving it into the operation room, in order to check
if there’s damage or non-apparent damage occurred during transportation.
The packages should be examined minutely during installation to avoid missing parts with small
dimensions or envelopes containing screws, washers, etc. Once damage is observed, notify service of the
transportation and insurance company immediately.
If non-apparent damage due to transportation was found during unpacking or installation, take the
same action in 15 days after delivery. The transportation corporation will not pay for non-apparent
damage generally unless making an application for inspection in 15 days after delivery.
If damage is discovered, contact the related company immediately, with specifying the type of
apparatus, the serial number and the order number if possible, and describing the nature of the damage.
Please follow the steps below to unpack the Brivo OEC 715/785/865 Mobile C-Arm X-ray Product.
3.3.1.
Shipping Container Inspection
Inspect the shipping container for damage.
Describe the state of the shipping container in below:
Содержание Brivo OEC 715
Страница 2: ......
Страница 19: ...Chapter1 Introduction and Safety...
Страница 41: ...Introduction and Safety 23 46 54 20 18 26...
Страница 55: ...Chapter2 System Overview...
Страница 137: ...Chapter3 Installation...
Страница 147: ...Installation 3 11 7 Put the ramp in position Release all bracket and move the workstation along the ramp off the pallet...
Страница 211: ...Installation 3 75 3 9 Reporting For U S Systems Complete and submit Form 2579 within 15 days of installation...
Страница 212: ...Chapter4 Calibration...
Страница 223: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 12 Mainframe Control Board TP7...
Страница 231: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 20 Mainframe Control Board TP17 POT4 J5 TP7 POT7 POT5...
Страница 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Страница 284: ...Chapter5 Software...
Страница 312: ...Software 5 29 4 Click Next 5 Click Install 6 Click Finish button to complete installation procedure...
Страница 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Страница 335: ...Chapter6 Troubleshooting...
Страница 408: ...Chapter7 Replacement...
Страница 418: ...Replacement 7 11 166...
Страница 488: ...Chapter8 Periodic Maintenance...
Страница 502: ...Periodic Maintenance 8 15...
Страница 505: ...Chapter9 Technical Reference...
Страница 520: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 9 16 Lateral configuration 1 5m Lateral configuration 1m...
Страница 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Страница 526: ...11 Appendix System Schematics...