Replacement
7-39
PWA, UPDOWN BOARD (P/N: 5085607)
1.
Remove the rear cover and front cover of the C-Arm
console.
2.
Disconnect all the cables of Updown Board.
3.
Remove the screws that secure Updown board to
chassis.
4.
Remove old Updown Board and replace a new one.
5.
Plug the cables to corresponding connectors.
6.
Reinstall the covers. Restart system and press lift
and down vertical column switches to verify
Updown board is functional.
Power Distribution Unit Board (PDU) (P/N: 5085606)
1.
Power off the system and disconnect Workstation’s
AC plug from the AC receptacle.
2.
Remove the covers of the Workstation.
3.
Remove the shield cover of PDU
4.
Disconnect the cables from the PCB board.
5.
Remove screws of PDU board.
6.
Replace PDU board with a new one.
7.
Put the insulation washer and new PDU board on
position and tighten the screws.
8.
Plug the wires in the corresponding socket and bind
the cables.
9.
The default power supply is AC 220V power input. If
your power supply is 110V, adjust the jumpers (J2
and J3). J2 is for 220V, J3 is for 110V. Refer to
chapter 3.5 for details.
10.
Refer to chapter 4.9 to perform power input
tolerance check and calibration (if needed).
11.
Reinstall the covers of console and restart system to confirm system can power on and take
exposure. Check all functions can work normally.
System Interface Board (P/N: 5085605)
Содержание Brivo OEC 715
Страница 2: ......
Страница 19: ...Chapter1 Introduction and Safety...
Страница 41: ...Introduction and Safety 23 46 54 20 18 26...
Страница 55: ...Chapter2 System Overview...
Страница 137: ...Chapter3 Installation...
Страница 147: ...Installation 3 11 7 Put the ramp in position Release all bracket and move the workstation along the ramp off the pallet...
Страница 211: ...Installation 3 75 3 9 Reporting For U S Systems Complete and submit Form 2579 within 15 days of installation...
Страница 212: ...Chapter4 Calibration...
Страница 223: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 12 Mainframe Control Board TP7...
Страница 231: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 20 Mainframe Control Board TP17 POT4 J5 TP7 POT7 POT5...
Страница 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Страница 284: ...Chapter5 Software...
Страница 312: ...Software 5 29 4 Click Next 5 Click Install 6 Click Finish button to complete installation procedure...
Страница 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Страница 335: ...Chapter6 Troubleshooting...
Страница 408: ...Chapter7 Replacement...
Страница 418: ...Replacement 7 11 166...
Страница 488: ...Chapter8 Periodic Maintenance...
Страница 502: ...Periodic Maintenance 8 15...
Страница 505: ...Chapter9 Technical Reference...
Страница 520: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 9 16 Lateral configuration 1 5m Lateral configuration 1m...
Страница 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Страница 526: ...11 Appendix System Schematics...