2 - 22
SPEC
CABLE ROUTING DIAGRAM
1
Hot starter cable
2
Radiator hose 2
3
Clamp
4
Ignition coil lead
5
Throttle position sensor lead
6
Hump (frame)
7
Oil hose
8
Hose guide
9
Neutral switch lead
0
CDI magneto lead
A
Clutch cable
B
Radiator breather hose
C
Engine stop switch lead
D
Sub-wire harness
E
CDI unit bracket
F
CDI unit
G
Throttle cable
H
Cylinder head breather hose
È
Fasten the hot starter cable,
throttle cables, throttle position
sensor lead and ignition coil
lead.
É
Fasten the throttle position
sensor lead behind the hump
of the frame.
Ê
Fasten the neutral switch lead
on the oil hose.
Ë
Pass the neutral switch lead on
the inside of the oil hose.
Ì
Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose.
Í
Fasten the neutral switch lead,
CDI magneto lead, radiator
breather hose and clutch cable
over the radiator mounting
boss.