2 - 23
SPEC
Î
Pass the radiator breather
hose in front of the radiator, on
the left of the chassis, and then
between the frame and radiator
hose 4.
Ï
Fasten the sub-wire harness
and engine stop switch lead to
the CDI unit bracket at the
white-taped portion of the sub-
wire harness and with the
clamp ends facing downward.
Ð
Locate the clamp ends in the
arrowed range.
Ñ
Fasten the neutral switch lead
and CDI magneto lead over the
hump of the frame.
Ò
Fasten the hot starter cable
and throttle cable onto the
frame. Locate the clamp ends
under the hot starter cable.
CABLE ROUTING DIAGRAM