2 - 25
SPEC
CABLE ROUTING DIAGRAM
1
Hot starter cable
2
Clutch cable
3
Throttle cable (return)
4
Throttle cable (pull)
5
Ignition coil
6
Negative battery lead
7
Starter motor lead
8
Coolant reservoir tank breather
hose
9
Cable holder
0
Coolant reservoir hose
A
Clamp
B
CDI unit lead
C
CDI unit
D
CDI unit band
E
CDI unit stay (frame)
F
Cable bracket
È
Pass the throttle cables, clutch
cable and hot starter cable
through the cable guides.
É
Pass the throttle cables, clutch
cable and hot starter cable
between the radiator and frame,
then over the middle radiator
mounting boss.
Ê
Pass the throttle cables and
clutch cable on the outside of
the ignition coil.
Ë
Pass the carburetor breather
hose (throttle cable cover)
through the hose holder.
Ì
Fasten the coolant reservoir
tank breather hose and carbure-
tor breather hoses together with
a plastic locking tie.
Í
Fasten the grommet of the clutch
cable with the cable holder.
Î
Fasten the CDI unit lead to the
frame with a plastic locking tie
ends at the lower of the frame
and cut off the tie end.
Ï
Insert the CDI unit band over the
CDI unit stay (frame) as far as
possible.
Ð
Fasten the starter motor lead
and negative battery lead to the
cable bracket in its slot with a
plastic locking tie and cut off the
tie end.
A
A
D
Ï
E
A
Ð
B
B
C
F
Í
9
0
Î
A
B
C
D
1
2
4
3
È
É
Ê
5
6
7
8
Ë
Ì