Section 7: Replacement Procedures
Page 7-32
TG3 Series Service Manual
7.19 REPLACING SIDE HOLE SENSOR (cont’d)
13.
Reverse the above procedures for reassembly.
Insert the
wiring harness
firmly and arrange the
wiring harnesses
to ensure that they are not pinched
during installation.
To replace Side hole sensor (upper) board
14.
Press the purple
Lid Latch Lever
to release the
Lid Latch
.
15.
Detach the
Lid Latch assembly
from the
Media route frame
based on
step 3
to
step 7
of
Section 7.18
Replacing Jump Hole Sensor
.
16.
Remove four
screws
(12) on both sides of the
Lid Latch assembly
and remove the
Feed Cover ASSY
(13).
17.
On the
Feed Cover (Bottom)
(14), remove the
two screw
(15) securing the
Upper Side hole sensor
board
(16).
18.
Replace the defective
Upper Side hole sensor board
(16) and reverse the above procedures for reas-
sembly.
Insert the
wiring harnesses
firmly and arrange the
wiring harnesses
to ensure that they are not pinched
during installation
19.
After replacement, adjust the Side hole sensor condition based on
Section 6.9.3 Side hole Sensor
Sensitivity Adjustment
.
12
13
14
16
15
15
Lid Latch
assembly
Summary of Contents for TG308
Page 1: ...Service Manual For printer model TG3 Series www satoamerica com PN 9001226 A...
Page 6: ...Table of Contents Page iv TG3 Series Service Manual This page is intentionally left blank...
Page 7: ...Section 1 Introduction TG3 Series Service Manual Page 1 1 INTRODUCTION...
Page 251: ...Section 9 Sato Group of Companies TG3 Series Service Manual Page 9 1 SATO GROUP OF COMPANIES...