
36
SRK-GZ
Model
Item
SRK25GZ-L1
SRK35GZ-L1
SRK502Z-L
Cooling
–
–
–
Heating
1.76~1.96 (18~20)
1.76~1.96 (18~20)
2.06~2.25 (21~23)
Cooling
0.39~0.49 (4~5)
0.39~0.49 (4~5)
0.29~0.49 (3~5)
Heating
–
–
–
Cooling
10~13
10~13
11~13
Heating
16~19
16~19
24~26
Cooling
4.8
6.3
10.2
Running current (A)
Heating
5.8
7.7
11.5
Note (1) The data are measured at following conditions
Ambient air temperature
Indoor side: Cooling ... 27˚C DB, 19˚C WB, Heating ... 20˚C DB
Outdoor side: Cooling ... 35˚C DB, 24˚C WB, Heating ... 7˚C DB, 6˚C WB
(4)
Insulation of connecting portion
(a)
Cover the connecting portion of the refrigerant piping with the pipe cover and seal them.
If neglecting to do so, moisture occurs on the piping and water will drip out.
(b)
Finishing and fixing
(i)
Tie up the piping with wrapping tape, and shape it so
that it conforms to which the pipe is attached.
(ii)
Fix them with clamps as right figure.
1.5.5
Test run
(1)
Conduct trial run after confirming that there is no gas leaks.
(2)
When conducting trial run set the remote controller thermostat to continuous operation position. However when the power source
is cut off or when the unit’s operation switch is turned off or was turned to fan operation position, the unit will not go into operation
in order to protect the compressor.
(3)
Insert in electric plug into the electric outlet and make sure that it is not loose.
(a)
When there is something wrong with the electric outlet and if the insertion of the electric plug is insufficient, there may occur
a burn out.
(b)
It is very important to be careful of above when plugging in the unit to an already furnished electrical outlet.
(4)
Explain to the customer on the correct usage of the air conditioner in simple layman’s terms.
(5)
Make sure that drain flows properly.
(6)
Standard operation data
Cover the exterior portion with cov-
ering tape and shape the piping so
it will match the contours of the
route that the piping to take. Also
fix the wiring and pipings to the
wall with clamps.
Insulation
Refrigerant piping
Electrical wiring
Covering tape
Drain hose
Tapping screw
Vinyl tape
To cover the connecting portion with
insulation material materials, cut upper portion
and then seal it with insulation materials.
Low pressure
MPa (kgf/cm
2
)
Temp. difference between
suction air and discharge
air (deg)
High pressure
MPa (kgf/cm
2
)
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...