4.5.6 Test run and handling instruction
(1)
Inspection
Check according to the following check items.
(2)
Test run
(1)
Conduct the test run after turning on the power for 20 minutes.
(Run electricity for 20 minutes with a hot stand-by to prevent compression of the compressor liquid.)
(2)
If the compressor does not operate after the operation has started, wait for 5 ~ 10 minutes.
(This may be due to a delayed start.)
(3)
Carry out the test run for each unit individually. (If 2 or 3 units are tested at the same time, wrong wiring and wrong pipe
connections cannot be checked.)
(4)
After each individual test, run the units in all the rooms simultaneously and check the units.
(5)
Test both the cooler and the heater.
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for approximately 3
minutes. This is to protect the unit and it is not a malfunction.
Beware of wrong connections in refrigerant piping and wiring
●
Make sure to match the piping and wiring from each unit to the outdoor unit.
●
Be careful because if connections are wrong, normal operation cannot be achieved and may damage the compressor.
[Correct connections]
[Example of wrong connections]
A unit
A
B
C
D
B unit
C unit
D unit
Outdoor
unit
Indoor unit
Indoor unit
Piping
Wiring
A unit
A
B
C
D
B unit
C unit
D unit
Outdoor
unit
Installation test check points
Check the following points again after completion of the installation, and before turning on the power. Conduct a test
run again and ensure that the unit operates properly. At the same time, explain to the customer how to use the unit and
how to take care of the unit following the instruction manual.
After installation
Test run
□
The power supply voltage is correct as the rating.
□
No gas leaks from the joints of the service valve.
□
Power cables and crossover wires are securely inserted and fixed
to the terminal board.
□
Each indoor and outdoor unit is properly connected (no wrong
wiring or piping).
□
Service valve is fully open.
□
Refrigerant has been additionally charged (when the total pipe
length exceeds the refrigerant charged pipe length).
□
The pipe joints for indoor and outdoor pipes have been insulated.
□
Earthing work has been conducted properly.
□
Air conditioning and heating are normal.
□
No abnormal noise.
□
Water drains smoothly.
□
Protective functions are not working.
□
Operation of the unit has been explained
to the customer.
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...