
218
SCM-HG
(2 room)
(7)
Outdoor unit inspection points
◆
Inspection of resistance value of Comp. dome
thermistor
Remove the connector and check the resistance value.
See the section of thermistor characteristics on page 213.
◆
Inspection of reactor conductivity
Remove the connector and check for
conductivity.It must be conductive.
¡
Inspection of electronic expansion valve
To test if there is voltage.
(Voltage is only applied to the electronic expansion valve when the valve angle is
being changed.)
Red to white
Red to Orange
Brown to yellow
Brown to blue
If the expansion valve does not operate as shown above, it is defective.
Normal if there is approximately DC 5 V 10 seconds
after the power supply is turned on.
}
¡
Display lamp inspection
• LED 2 (Abnormality display lamp - Red)
• LED 1, 3 to 6: (Light display for each
room - Green)
ON or flashing: Protection function operating
ON when there is a serial signal being
received among each of the indoor units.
OFF during ignition, stop abnormality.
¡
Power source and serial
signal inspection
1
to
2
: AC220/240V
2
to
3
: Normal if the voltage oscil-
lates between DC 0 and
approx. 12V
CAUTION – HIGH VOLTAGE
High voltage is produced in the control box. Don't touch
electrical parts in the control box for 5 minutes after the unit is
stopped.
~
+
+
+
+
+
–
~
1
2
3
1
2
3
1
2
Y/GN
Y/GN
WH
BK
BL
WH
BK
RD
Serial A
Serial B
G
CNB
CNB
LED1
LED3
LED2
(Red)
GY
DS
IC2
P
RD
U
WH
BK
Tho-A
Tho-R
CND
CNC
CNA
CNF
CNE
CNA
Tho-D
V
W
N
BL
OR
WH
WH
BK
UNIT A
UNIT B
Power source
1 Phase
220/240V
50Hz
Printed circuit board
Fuse
250V 25A
Printed circuit board
Power
transistor
CM
20S
EEVA
FMo
EEVB
(Green)
52X2-4
AC·R
AC·S
S. OUT
R. IN
S. IN
L
Output voltage
(ACV)
(Example)
Self-diagnosis display : Flashes 2 times
Measure in this section
Operation SW ON
8 ~ 10 sec.
0
1
◆
Power transistor inspection procedure
[Use a tester with a needle indicator for the inspection. (Do not use a digital tester. Check in the AC 300 volt range.)]
(1)
If there is a self-diagnosis display, inspect the compressor system (burns, wiring mistakes, etc.). If no problems are found,
check the output of the power transistor.
(2)
Output inspection procedure
Disconnect the terminals for the compres-
sor. If an output such as the one shown in
the figure on the right can be measured,
the power transistor and the circuit board
for the outdoor unit are normal.
For about 50 seconds. After being switched on,
there will be a delay of approximately one minute
depending on the conditions.
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...