
175
SCM-HG
(4 room)
Check fuse. There should be conductivity.
Note (1) SCM80HENG-L : 250V 30A
SCM100HENG-L : 250V 50A
Display lamp inspection
For confirming
electrical discharge
Room A
Power source
1 Phase
50/Hz
Room B
Room C
Room D
Tester probe
∞
Normal condition
,
+ (WH)
+ (WH)
.
+ (GR)
+ (GR)
Signal display
Room D
CNH
(White)
Condenser
(C101)
CNJ
(Black)
CN2
(White)
Reactor
White
.
mark
Tester probe
(BK)
Tester probe
(RD)
White
Brown
Gray
Red
Blue
Orange
GR
Green
Blue
Surge
absorber
Black
White
Black
White
Black
White
Brown
FUSE
Red
Yellow
Black
Black
Gray
Approx. DC 280 V
P(+)
P1
DS
CT
AB
1
B
W
L
N
23
1
2
3
1
23
1
2
3
C
NF
NF1
D
R2
R1
S1
BK
WH
BK
WH
G
2
(1)
3
14
S2
R
T
N
–
P+
Condenser
Power transistor
Printed circuit board
U
Red
White
Black
V
W
CM
CNA2
(Red)
CNA1
(White)
CNG
(Black)
CNF
(White)
CNE
(Yellow)
CND
(Blue)
CNC
(Red)
CNB
(White)
CNI
(Black)
CNS
(Red)
Black
Outdoor temperature thermistor
Heat exchanger thermistor
Discharge pipe thermistor
Black
Black
CNP
(Yellow)
CNO
(Blue)
CNN
(Red)
CNM
(White)
Room C
Room B
Room A
LED3
LED1
EEV
A
EEV
B
EEV
C
EEV
D
SV
A
SV
B
SV
C
SV
D
SV
DF
FM
01
FM
02
20S
63H
LED2
SWA
SWB
SWC
Unit model set switch
SWD
ON
OFF
LED4
LED5
LED6
Abnormality
display
Operation
display
LED7
●
Power supply and serial
signal inspection
1
to
2
: AC220V
2
to
3
: Normal if the voltage oscil
-
lates between DC 0 and
approx. 12V
●
Inspection of capacitor
Check the charging characteristics
with a tester. (Needle should
swing and return slowly. Change
the polarity and check again. If
the needle returns, it is normal.)
●
Inspection of electronic expansion valve
To test if there is voltage.
(Voltage is only applied to the electronic expansion valve when the valve angle is
being changed.)
Red to white
Red to Orange
Brown to yellow
Brown to blue
If the expansion valve does not operate as shown above, it is defective.
●
Inspecting the solenoid valve
SVA to D: Each room is operating. ON (AC220V)
SVDf: When defrosting ON (AC220V)
●
Display lamp inspection
• LED 1 (Operating display lamp - Green)
• LED 2 (Abnormality display lamp - Red)
• LED 3 to 6: (Light display for each room -
Green)
• LED 7 (Red):
ON: Power supply and IC normal
OFF: Power supply abnormality
OFF or ON: IC abnormality
ON or flashing: Protection function operating)
ON when there is a serial signal being
received among each of the indoor units.
OFF during ignition, stop (including no
connection), abnormality
Service LED (for confirming discharge)
(When tester probes
are inverted, the read
-
ing should be approx.
10~20
Ω
.)
●
Inspection of diode stack
●
Inspection of reactor conductivity
Remove the connector and check for conductivi
-
ty. It must be conductive.
●
Inspect power transistor.
Remove the fasten terminal and test out
-
put voltage.
●
Inspection of resistance value of discharge
-
pipe thermistor.
Remove the connector and check the resistance value.
See the section of thermistor characteristics on page 169.
Normal if there is approximately DC 5 V 10 seconds
after the power supply is turned on.
}
*
*
*
(b)
Outdoor unit inspection points
u
T
urn power supply of
f before inspecting.
(Do not touch any components in the
controller box until LED 7 goes out.)
u
*
Check these points with the power
supply on.
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...