
SCM-C
248
(5)
DRY operation
(a)
Choose the appropriate operation block area by the difference between room temperature and thermo-
stat setting temperature as shown below.
• Operation block area
Note (1) Thermostat operation is performed in A.B.Block. When compressor and indoor fan stop by thermostat operation within 12
minutes from start, temperature check is performed by operating indoor fan at Speed 1 (Lo) for 20 seconds before finishing 12
minutes and allowing decision of next operation block.
(b) Start up operation
–2
0
+3
Room temp.
– Setting temp.(deg)
D Block
C Block
B Block
A Block
Compressor
and
outdoor fan
Indoor fan
Start
Temperature check
Start
Temperature check
Compressor
and
outdoor fan
Indoor fan
Operation block decision
C.D Block
A.B Block
minutes
minutes
speed 1
speed 1
seconds
(c)
DRY operation
After finishing start up operation described in (b) above, thermal dry operation is performed at 8 minutes
intervals, according to the difference between room temperature and thermostat setting temperature as
shown below.
Besides, 1 cycle of this operating time consists of 8 minutes. 7 cycle operation is performed then.
Compressor
and
outdoor fan
Indoor fan
D Block
Compressor
and
outdoor fan
Indoor fan
C Block
Compressor
and
outdoor fan
Indoor fan
D Block
Compressor
and
outdoor fan
Indoor fan
C Block
seconds
seconds
minutes
minutes
Start
Temperature check
Start
Temperature check
Operation block decision
seconds
minutes
minutes
Start
Temperature check
Temperature check
Operation block decision
Start
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...