35
SRK-GZ
1.5.4
Refrigerant piping
(1)
Preparation
Keep the openings of the pipes covered with tapes etc. to prevent dust, sand, etc. from entering them.
Indoor unit side
Outdoor unit side
(2)
Connection of refrigerant piping
Indoor unit side
¡
Connect firmly gas and liquid side
pipings by Torque wrench.
Outdoor unit side
¡
Connect firmly gas and liquid side
pipings by Torque wrench.
¡
Specified torquing value:
Liquid side (ø6.35) : 15.7~19.6N·m (1.6~2kgf·m)
Gas side (ø9.52)
: 29.4~39.2N·m (3.0~4.0kgf·m)
Gas side (ø12.7)
: 39.2~49.0N·m (4.0~5.0kgf·m)
¡
Use one more spanner to fix the valve.
¡
Always use a Torque wrench and back up spanner to tighten the flare nut.
(3)
Air purge
(a)
Tighten all flare nuts in the pipings both indoor and outside wall so as not to cause leak.
(b)
Connect service valve, charge hose, manifold valve and vacuum pump as is illustrated below.
(c)
Open manifold valve handle Lo to its full width, and perform vacuum or evacuation.
Continue the vacuum or evacuation operation for 15 minutes or more and check to see that the vacuum gauge reads – 0.1
MPa (– 76 cmHg).
(d)
After completing vacuum operation, fully open service valve (Both gas and liquid sides) with hexagon headed wrench.
(e)
Check for possible leakage of gas in the connection parts of both indoor and outdoor.
¡
Remove the flared nuts.
(on both liquid and gas sides)
¡
Remove the flared nuts.
(on both liquid and gas sides)
¡
Install the removed flared nuts to the pipes to be connected,
then flare the pipes.
Dimension A
Liquid side
(
φ
6.35):
9-9.5 dia
Gas side
(
φ
9.52):
13.2-14 dia
(
φ
12.7):
16.2-17 dia
Press
Remove
Remove
(Do not
turn)
Spanner
for fixing
the piping)
Torque
wrench
Additional refrigerant charge
When refrigerant piping exceeds 5m(50:7m) conduct additional refrigerant charging after refrigerant sweeping.
A mount of additional charge per meter: 20 g/m
Example of additional charge amount calculation
Calculate the additional charge amount, when the piping length is 10 m.
(10 – 5) m
×
20g/m = 100g
100g for additional charge amount
Stop valve
(Two-way valve)
Service port
Charge hose
Vacuum pump
Charge hose
Handle Hi
(pressure)
Manifold
valve
Pressure
gauge
Compound
(Gauge)
Stop valve
(Three-way
valve)
Handle Lo
(pressure)
–76 cm Hg
¡
Specified torquing value:
Liquid side (ø6.35) : 15.7~19.6N·m (1.6~2kgf·m)
Gas side (ø9.52)
: 29.4~39.2N·m (3.0~4.0kgf·m)
Gas side (ø12.7)
: 39.2~49.0N·m (4.0~5.0kgf·m)
Summary of Contents for SRRM40HENG-L
Page 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Page 52: ...50 SRK GZ MEMO ...
Page 94: ...92 SRK H MEMO ...
Page 104: ...102 102 SRK C MEMO ...
Page 180: ...178 SCM HG 4room MEMO ...
Page 222: ...220 SCM HG 2room MEMO ...
Page 234: ...232 SCM CG 2room MEMO ...
Page 266: ...SCM C 264 MEMO ...
Page 406: ...404 FDT N C MEMO ...
Page 442: ...440 FDEN H MEMO ...
Page 470: ...468 FDEN C MEMO ...
Page 504: ...502 FDKN H MEMO ...
Page 580: ...578 FDR H MEMO ...
Page 698: ...696 V MULTI Models FDR258 A 308 A ...
Page 724: ...722 V MULTI MEMO ...
Page 1094: ...1092 FDC HKXR MEMO ...