
MAC215990
432
Revision A
1013936
A
Figure 4.371: Supporting Reel
4.
Support the inboard end of the right reel with a front-end
loader and nylon slings (A) or equivalent lifting devices.
IMPORTANT:
Avoid damaging or denting the center tube by supporting
the reel as close to the end of the reel as possible.
1001322
A
B
Figure 4.372: U-Joint
5.
Remove four bolts (A) securing the reel tube to U-joint
flange (B).
1001613
C
B
A
Figure 4.373: Replacing Chain
6.
Move the right reel sideways to separate reel tube (A) from
U-joint (B).
7.
Remove drive chain (C).
8.
Route chain (C) over U-joint (B). Slip the chain onto the
sprockets.