MAC215990
274
Revision A
4.6.2
Installing Driveline
The driveline transfers power from the combine PTO to the header
’
s float module completion gearbox. It will need to be
installed on the float module.
DANGER
To prevent injury or death from the unexpected start-up of the machine, always stop the engine and remove the key
from the ignition before leaving the operator
’
s seat for any reason.
ϭϬϰϬϮϳϰϭϬϰϬϵϰϵ
A
B
Figure 4.45: Determining Driveline Phase
IMPORTANT:
If the driveline has been disassembled, ensure that the two
halves are in phase before the driveline is installed on the header
and combine. The image illustrates correct phasing (A) and
incorrect phasing (B).
1.
Start the engine. For instructions, refer to the combine operator
’
s manual.
2.
Lower the reel fully.
3.
Lower the header fully.
4.
Shut down the engine, and remove the key from the ignition.
ϭϬϯϴϲϵϬ
B
A
Figure 4.46: Driveline Support Bracket
5.
Position driveline support bracket (A) (supplied with the
driveline) on the left inside of the float module as shown.
Secure the bracket with two M10, 30 mm bolts and flange
nuts (B).