
53
Part 1 Installation
Chapter 4 Operation
1. Startup
(1) Connect the motor cable and encoder cable to the controller.
(2) Connect the PIO connector to the host PLC using the supplied flat cable.
(3) Execute an emergency stop.
(4) Connect the PC or teaching pendant.
Set the AUTO/MANU switch to the “MANU” side.
(5) Supply the 24-V PIO power through the flat cable.
(6) Turn on the control power and motor power at the same time. (They should be taken from the same
power supply.)
(7) Reset the emergency stop.
The EMG lamp turns off.
If the ALM lamp is lit, an error is present. Check the error list to identify the problem.
If the 24-V PIO power is not supplied, an “E69” error will generate.
To check for errors, connect the teaching pendant, PC software or panel unit.
Summary of Contents for PSEL
Page 2: ......
Page 10: ......
Page 18: ...8 Part 1 Installation ...
Page 37: ...27 Part 1 Installation 2 2 axis specification with battery ...
Page 382: ...372 Appendix Micro cylinder RCL Series Current limiting value ratio Push force N ...
Page 476: ...466 Appendix ...
Page 480: ...470 ...
Page 485: ...475 ...
Page 487: ...INTELLIGENT ACTUATOR SEL Language Programming Manual Eighth Edition ...
Page 488: ......
Page 490: ......
Page 494: ......
Page 518: ...24 ...
Page 526: ...32 ...
Page 831: ... 11 Actuator Control Declaration 337 Example DFIF 1 170 ...
Page 1060: ......
Page 1061: ......