
1. Preparation in
Advance
49
(Example 2) Position to Position No. 5 and No. 6 via PTP operation on Work Coordinate
System No. 2.
The R-axis position is shown to the left
(viewed from above).
The Z-axis position is as follows:
Position No. 5 Zb = 25
Position No. 6 Zb = 45
Position No. 5
Position No. 6
Position No. 5
Position No. 6
D-cut surface
of R-axis
(- direction)
Program example
:
:
:
SLWK
2
Select Work Coordinate System No. 2
SLTL
0
Select Tool Coordinate System No. 0
PTPR
Specify right arm of PTP target arm system
MOVP
5
Move to Position No. 5.
MOVP
6
Move to Position No. 6.
:
:
:
Summary of Contents for PSEL
Page 2: ......
Page 10: ......
Page 18: ...8 Part 1 Installation ...
Page 37: ...27 Part 1 Installation 2 2 axis specification with battery ...
Page 382: ...372 Appendix Micro cylinder RCL Series Current limiting value ratio Push force N ...
Page 476: ...466 Appendix ...
Page 480: ...470 ...
Page 485: ...475 ...
Page 487: ...INTELLIGENT ACTUATOR SEL Language Programming Manual Eighth Edition ...
Page 488: ......
Page 490: ......
Page 494: ......
Page 518: ...24 ...
Page 526: ...32 ...
Page 831: ... 11 Actuator Control Declaration 337 Example DFIF 1 170 ...
Page 1060: ......
Page 1061: ......