
Install the outer bearing (8).
NOTE.
Push the bearing as far as it will go by tapping with a plastic
hammer all around the rim.
Install the complete gear ring flange (5).
NOTE.
To engage the flange (5), use a plastic hammer and
hammer alternately on several equidistant points.
Ensure that faces are thoroughly clean, and then mount the safety
flange (6).
Apply Loctite 242 to the studs and tighten nuts (4).
Tighten nuts (4) in two stages using the criss-cross method.
Initial tightening torque: 250 Nm.
Final tightening torque: 460±465 Nm.
Fit the planetary cover (2) on the wheel hub (7).
ATTENTION!
Check state and position of O-ring (11).
Lock the planetary cover (2) with screws (1).
Tightening torque for screws: 40±50 Nm.
GB
GB
GB
GB
GB
GB
a
b
c
d
f
e
58
ASSEMBLING THE EPICYCLICAL REDUCTION GEAR - ASSEMBLAGGIO RIDUTTORE EPICICLOIDALE -
ZUSAMMENBAU DES PLANETENGETRIEBES - ASEMBLAJE REDUCTOR EPICICLOIDAL - ASSEMBLAGE DU REDUCTEUR EPICYCLOIDAL
F1241740
8
F1241741
5
F1241819
6
14
F1241742
4
F1241820
2
7
F1241743
1
2