3 . R e p a i r I n s t r u c t i o n s
1 / 2 0 1 0
3 - 106
BA-TE-DE08C M.KAY
Dialog SW9xx_sm_Chapter 3_1-2010.doc/pdf <100329> yymmdd
B. Braun Avitum AG
SW9.xx
3.8.2.7
Electrical Safety Check
1.
Electrical safety check according to EN 62353/EN 60601-1:
•
Protective earth resistance, equipment leakage current, patient leakage
current.
3.8.2.8
Perform Disinfection after Repair
1.
Select disinfection program.
2.
Select disinfection type and start disinfection (depends on applied process
and procedure in the dialysis centres, see chapter disinfection in the
instructions for use).
3.8.2.9
Document the Executed Activities
1.
The measures were executed correctly. Fill in the execution protocol after
service (e.g. exchange of a component) and after executing all necessary
measures according to the repair matrix.