4 . T S M S e r v i c e P r o g r a m
1 / 2 0 1 0
4 - 166
BA-TE-DE08W M.KAY
SW9xx_SM_Chapter 4-3-1_1_2010.doc/pdf <110301> yymmdd
B. Braun Avitum AG
Dialog
+
SW 9.xx
5.
Set temperature
TSD
to 37
o
C and wait for the temperature reached.
Note for machines equipped with DF filter:
The
DF
filter and the tubings going to the
DF
filter must be free of air before
the
DDE
can be adjusted. Therefore the machine must be switched into Bypass
for a few minutes to purge the air. Switch off the bypass for the calibration of
DDE
as it has to be done in mainflow.
6.
Loosen lock nut on
DDE
adjustment screw.
7.
Set a pressure of 300 mmHg/400 mbar with the adjustment screw of
DDE
.
•
300 mmHg
±
37 mmHg
•
400 mbar
±
50 mbar
8.
Tighten lock nut again.
9.
Remove manometer and flow meter.