Chapter 4 Unpacking and Inspecting
Installation and Commissioning Manual
101
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Step 3
Take inventory.
Compare the contents of the box with the packing slip and the copy of
the purchase order list or equipment list provided by ADVA Optical
Networking to ensure complete and accurate shipment. Make a note
of missing items, if necessary.
Step 4
Visually check all items and the accessories for external damage. If
identified, make a note of any damaged or missing items.
Step 5
Remove the 1HU shelf and the accessories from the cardboard box.
Step 6
Wrapped in its ESD protective bag, put the shelf on an antistatic mat.
Step 7
When you are ready to inspect the shelf, remove the ESD protective
bag from the shelf and lay it aside.
Step 8
Verify that you have the proper shelf type. Use the shelf type label on
the top of the shelf for identification.
Step 9
Check the shelf for shipping damage and proper configuration as
described in
“Inspecting an FSP 3000R7 Shelf” on p. 111
and
Step 10 Save the cardboard box and the packaging material for re-use.
Step 11 If any item is missing, or if any item is damaged, notify your customer
service representative or ADVA Optical Networking immediately.
End of Procedure
Unpacking a DCM Shelf
This section describes how to unpack a DCM Shelf (SH1HU-P/DCM).
Each DCM Shelf shipment consists of one equipment pack. The DCM-P/xx
modules are not included. They are shipped separately.
Risk of damage due to electrostatic discharge!
Keep the shelf in its ESD protective bag until you are ready to inspect
it.
P
S
Note
Do not destroy or discard the cardboard box. Flatten and save it along
with the packaging material. This way you can transport a shelf safely
or, if necessary, return it to the factory for repair.