
Installing the SH9HU, SH7HU, SH7HU-R and 1HU Equipment Shelves
138
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Figure 18:
ETSI and NEBS Adaptor Brackets for a SH1HU-R/PF
To replace the 19-inch brackets with the front NEBS brackets or the ETSI brack-
ets perform the following steps:
Procedure
Step 1
Take the SH1HU-R/PF Shelf out of its shipping box and put it on a
grounded flat surface or an antistatic mat.
Step 2
Remove the ESD protective bag from the shelf and lay it aside.
Step 3
Take the ETSI brackets or the appropriate NEBS brackets and the
Steel stiffener out of the plastic bags (as supplied in the rack-mount
kit).
Step 4
Remove the 19-inch bracket on one side panel of the shelf as follows:
a) Using a Torx screwdriver TX25, turn the three screws fixing the
19-inch bracket in counter-clockwise direction until they are
removed from thread holes completely and lay them aside.
b) Remove the bracket and put it aside.