
Supplies and Tools Required
56
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Telemetry Interface Cable
The telemetry interface cable is used to connect the UTM or the 9HU shelf to
device alarm inputs and to external alarm devices. This cable is not provided by
ADVA Optical Networking. Therefore, the customer has to build his own cable
according to the network requirements. For the connector pinout, refer to
Chapter 3: Telemetry Interface Cable
,
SCU-Intercom-Kit
For interconnecting two shelves within a node you need the SCU-Intercom-Kit.
It can be delivered with the equipment but must be ordered separately. For
details, refer to the
Hardware Description
, Appendix B.
Fiber-Optic Jumpers
Fiber-optic jumpers are provided by ADVA Optical Networking in pairs. Nor-
mally, jumpers are delivered with the shelf as ordered. They may be
pre-installed or are packaged and labeled according to the shelf. See also
porting Documents and Additional Information” on p. 53
.
Tools and Equipment Required
The following tools and equipment are needed to install the FSP 3000R7. The
installation procedures in this document will specify when specific equipment is
required.
Tools
•
Torx size 10 screwdriver, for loosening the knurled screws on the module
faceplate
•
Torx size 20 screwdriver, for attaching adapter brackets
•
Appropriate screwdriver, for tightening the rack screws
•
No.3 Pozidrive screwdriver, for attaching the earthing wire to the rack
•
No.1 Phillips screwdriver or flat-blade screwdriver sized 1 mm x 5mm for
attaching DC power cables
•
Wrench or Box spanner (wrench size of 7 mm or 0.276 in) for tightening the
earthing screw nuts on the shelf
•
Appropriate measuring tool, e.g. self-retracting pocket tape measure
•
Wire cutting pliers
•
Wire strippers
•
Crimping tool
Electrical Test Equipment
•
Multimeter