
Rack-Mounting the DCF1HU-P Shelf
196
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Shelf to the NEBS standard rack dimensions. ETSI brackets are required to
adapt the shelf to the ETSI standard rack dimensions.
It is assumed that you are familiar with ESD-prevention precautions that should
be taken to avoid ESD damage to the equipment.
Tools and Parts Required
•
1 x 19-inch bracket pair or
•
1 x 23-inch bracket pair or
•
1 x ETSI bracket pair or
•
1x customized ETSI bracket pair
•
8 x screws for fixing the brackets
•
Torx screwdriver TX 10
•
ESD-preventive wrist strap or other personal earthing devices
•
Suitable grounded surface or an antistatic mat for placing the shelf
shows a 19-inch bracket.
CAUTION
Only Service Personnel are allowed to perform this procedure.
Ensure that you are grounded with a wrist strap or equivalent while
mounting the brackets to a shelf which contains ESD-sensitive
devices.