
Installation and Commissioning Manual
25
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Organization
This documentation is organized as follows:
The Preface describes the purpose, audience, organization and the conven-
tions, that are used throughout this documentation. It also provides important
ADVA Optical Networking contact details as well as further useful information.
11.1.1
80000015930
Issue A
March 2012
Chapter 5
- Section “Connecting the
40CSM/2HU Shelf to a
Management Controller” added;
In Subsection “Connecting AC
Power Cords” Fig. 33 exchanged;
- Section “Connecting the DC
Power Cables to SH7HU and
SH1HU-F/2DC and the
DC-powered 40CSM-OJG/3HU
Shelves” revised, Fig. 28
exchanged, connecting the
CBL/DC/300/3AWG14/FLT/R-/B+
power cable added
Chapter 6
Section “Connecting a NCU to an
OSCM” added
Chapter 7
Ethernet cable routing added to
section “Interconnecting 1HU
Shelves with SCU-S Modules”
Chapter 9 revised
Adding the following sections:
- Introduction
- Safety Guidelines
- Interconnecting OSCM and
OSFM Modules
11.1.2
80000015930
Issue B
April 2012
Chapter 5
updated
updated
updated
Chapter 6
added
Chapter 7
added
Product
Release
Documnet
Number
Document
Issue
Issue Date
Description