
Installation and Commissioning Manual
225
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Chapter 6
Installing System Modules
This chapter provides step by step instructions on how to install the system
modules (plug-in modules) in the appropriate shelf after it has been installed in a
rack or cabinet. In addition, it tells you how to mount and remove the front cov-
ers of the shelves. The chapter treats the different procedures in a great detail.
This chapter contains the following sections:
, which provides additional information for the effective installation
of the FSP 3000R7 system modules.
which tells you who this document is intended for.
which lists the documents to help you install optical
modules in a FSP 3000R7 shelf successfully.
Specialized Knowledge Required
,
which tells about special knowledge needed
for performing the installation tasks.
,
which describes how to install the different power
supply units in the appropriate FSP 3000R7 equipment shelf. It also provides
general installation notes and safety guidelines.
,
which describes how to insert optical modules into a
slot of an FSP 3000R7 equipment shelf. It also provides general installation
notes for channel modules and safety guidelines.
Installing Pluggable Transceivers
, which describes how to insert the different
pluggable transceivers in the appropriate channel module interface cage. It also
provides handling and safety guidelines.
, which describes how to connect the Ethernet
ports of the NCU and the OSCM with an Ethernet cable.
Removing and Inserting a Dummy Module
, which describes how to
remove/insert a dummy module from/into an empty shelf slot.
Mounting and Removing Front Covers
, which describes how to mount and
remove the front cover of the 7HU and 9HU shelf as well as the 40CSM/2HU
shelf.