
Installation and Commissioning Manual
285
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Chapter 8
Powering Up/Down
This chapter describes how to power up and down the Fiber Service Platform. It
contains the following sections:
, which tells you who this document is intended for.
, which describes how to power up the FSP 3000R7 equip-
ment.
, which informs about the reason for some problems that may
occur while powering up the FSP 3000R7 equipment.
Audience
This chapter is intended for Service Personnel as well as qualified and trained
equipment installers who need to rack-mount and earth a shelf, and perform
power cabling tasks. Personnel are considered to be qualified if they have the
necessary knowledge and practical experience of mechanics and electrical
engineering to appreciate the various hazards that can arise from working on
the shelf, and to take reasonable precautions to prevent personal injury and
equipment damage.
Switching Power On
This procedure checks whether all components have been connected to their
respective power supplies.
Procedure
Step 1
Unlock the main power switches and turn them on.
Step 2
As soon as power is up, the NCU starts booting. Check if this is indi-
cated by the slot LEDs all blinking yellow.