
Unpacking a DCM Shelf
102
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
The DCM Shelf is delivered with two 19-inch rack mount brackets, pre-installed.
Each slot is covered by a front panel.
Tools Required
You need utility scissors or a utility knife to open the cardboard box.
Procedure
To unpack a DCM Shelf perform the following steps:
Step 1
Move the cardboard box with the DCM Shelf to the location where the
shelf will be installed.
Step 2
Open the cardboard box on the upper side only as follows:
a) Using a utility knife or scissors, cut open the adhesive tape. Pay
attention not to damage the flaps.
b) Lift the flaps toward you so that the box is opened completely.
Step 3
Remove everything from the cardboard box.
Step 4
Verify you have the proper shelf type. Use the shelf type label on the
top side for identification.
CAUTION
Only Service Personnel are allowed to unpack a DCM Shelf.
P
S
Note
Review the guidelines provided in
before you
open the shipping box and unpack a DCM Shelf.
P
S
Note
Make sure that the shipping box has been in the installation location
for a minimum period of 24 hours to avoid thermal shock and surface
condensation when unpacking.
Risk of damage due to electrostatic discharge!
Keep the shelf in its ESD protective bag until you are ready to inspect
it.