
Chapter 4 Unpacking and Inspecting
Installation and Commissioning Manual
103
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Step 5
Verify you have the following items:
•
1 x ETSI bracket pair
•
1 x ETSI customized bracket pair
•
1 x 23-inch NEBS bracket pair
•
1 x Introduction Folder containing
•
Cover sheet (printed)
•
Safety Guide (printed)
•
Critical Warnings (printed)
Make a note of missing items, if necessary.
Step 6
Visually check the DCM Shelf for signs of external damage. If identi-
fied, make a note of any damaged or missing items.
Step 7
If the DCM Shelf is not mounted to the rack afterwards, put it into the
cardboard back and close the box. Otherwise, save the cardboard
box along with the packaging material for re-use.
Step 8
In case you have found any discrepancies, proceed as follows:
a) If the DCM Shelf has been damaged in transit, immediately report
the extent of damage by filing a claim with the transportation com-
pany. Notify your ADVA Optical Networking customer service rep-
resentative or ADVA Optical Networking. Have the following
information ready:
•
Invoice number of shipper
•
Name of the damaged unit
•
Serial number and item number of the damaged unit
•
Description of damage
•
Effect of damage on the installation
If damaged, unit must be returned to the factory, refer to
ment Return and Repair” on p. 119
. Order replacement of equip-
ment, if necessary.
b) If any standard item is missing, notify your ADVA Optical Net-
working customer service representative or ADVA Optical Net-
working immediately.
c) If the wrong unit has been shipped, contact ADVA Optical Net-
working customer service representative or ADVA Optical Net-
working.
For contact details, see the Preface of this guide,
End of Procedure
P
S
Note
Do not destroy or discard the cardboard box. Flatten and save it along
with the packaging material. This way you can transport a DCM Shelf
safely or, if necessary, return it to the factory for repair.