Method 2 - A definition using relative height distances
This method uses height differences relative to the vertical alignment to define
the height of the left and right rail.
Rail_003
a
b
c
e
g
d
f
a Track centreline
b
Left rail
c
Right rail
d
Nominal gauge
e
Superelevation base
f
Left superelevation (left cant)
g
Right superelevation (right
cant)
43.6.10
Rail - Working with Multiple Tracks
Multiple tracks are used when more than one track share a common centreline,
from which all chainages are calculated.
When there are multiple tracks with independent centrelines for each track,
each track is then considered as a single track. Refer to "43.6.9 Rail - Working
with a Single Track" for details on single tracks.
b
a
f
e
g
c
d
Rail_004
a
Chainage centreline
b
Left track centre ine
c
Left track left rail
d
Left track right rail
e
Right track centreline
f
Right track left rail
g
Right track right rail
Rail_005
b
a
c
d
f
e
g
j
h
i
k
Description
Diagram - Plan
Diagram - Section
696
Roads - General
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...