Field
Description
a b
Road_099
a
Vertical alignment
b
Horizontal alignment
Only tangent points are detected. A tangent point is the
start/end point of a road segment.
Nearest ver-
tical tan-
gent point
Distance to the nearest vertical tangent point of the design.
Height dif-
ference at
3D chainage
Offset perpendicular to the vertical component of the selec-
ted line.
This value can be useful when dealing with pipelines, cables
and in the construction segment.
3D chainage
Chainage of the measured point is projected perpendicular to
the vertical component of the selected line.
b
a
c
d
e
Road_089
a
3D chainage
b
Chainage
c
Centreline
d
Centreline height difference
e
Height difference at 3D chainage
Centreline
grade
Grade of the centreline at the current position.
Direction to
point
Direction from the current position to the point to stake out.
Distance to
point
Distance from the current position to the point to stake out.
Defined
easting
Easting of the point to stake out.
Defined
northing
Northing of the point to stake out.
Defined
height
Height of the point to stake out.
652
Roads - General
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...