Field
Option
Description
View results
after stak-
ing a point
Check box
When this box is checked, the stake results
are displayed after staking a point.
Next step
Page
changes to the
Graphics
page.
This page is only available for staking operations.
Description of fields
Field
Option
Description
Help me
navigate
The reference direction to be used to stake-
out points. The stakeout elements and the
graphical display shown in the Measure to
line/Stake to line app are based on this
selection.
Using line
being
staked
The direction of the orientation is parallel to
the line.
From behind
instrument
Available for TS.
The direction of the orientation is from the
instrument to the point to be staked.
Facing
instrument
Available for TS.
The direction of the orientation is from the
current position relative to the instrument.
Facing last
measured
point
The direction of the orientation is from the
current position relative to the last recorded
point.
Facing point
(design
data)
The direction of the orientation is from the
current position relative to a point from the
design job.
Facing point
The direction of the orientation is from the
current position relative to a point from the
job.
Facing north
Available for GS.
The direction of the orientation is from the
current position relative to North.
Following
arrow
The direction of the orientation is from the
current moving direction to the point to be
staked. The graphical display shows an arrow
pointing in the direction of the point to be
staked. The current position must have
moved at least 0.5 m for the orientation to
be calculated.
Facing sun
Available for GS.
The position of the sun calculated from the
current position, the time and the date.
Settings,
Graphics page
568
Measure to line/Stake to line
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...