43.5
Tasks
When staking out or checking a road/rail/tunnel, often it is not possible to fin-
ish a particular task in one go. The element to be staked out or checked can be
stored together with all defined settings as a work task.
Stored in a task are:
•
Selected layer
•
Working chainage
•
Selected line(s) or element
•
Shifts
Tasks are stored within the selected Road/Rail/Tunnel job. They can be created
at any time when working in the field or during preparation in the office.
Deleting a task does not delete the referenced jobs.
Deleting a Road/Rail/Tunnel job deletes all referencing tasks.
Tasks are method-specific.
1.
Start the Roads/Rail/Tunnel app.
2.
Select a method, if necessary, and press
OK
.
3.
In the Define panel press
Save task
.
4.
Type in a name for the task and press
OK
.
Access
Press
Load
in the Define panel.
Key
Description
OK
To select the highlighted task and continue.
Delete
To delete the selected task.
More
To display information about
Date
,
Time
,
Creator
and
Description
.
Fn
Name
or
Time
To sort task list by name or time.
Description
Creating a task
Load a Defined Task/
Load a Defined Rail
Task/
Load Defined Tunnel
Task
Roads - General
685
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...